It’s Time for Masonry

Yesterday we had the opportunity to walk through the construction site at St.Vincent with our general contractor, Leo Post, and architect, David Heyne. Things are really coming along, to say the least.

With the form of the addition completely erected, exterior sheeting completed, and masonry work started, it’s easy to see that progress is being made. Be sure to keep an eye out because in the next few weeks the masonry work will be complete!

It’s exciting to see the amount of interior work that has been completed, as well. All walls in the rectory area have been stripped down and are awaiting their new drywall finish, demolition work is complete in all areas, and new metal framing is being installed (not to mention new ductwork is going in, see below for pictures!).

It’s an exciting time to see how much progress has been made and also to be humbled by how much is left to be done. We ask that you will continue to pray through this project with us.

Exterior sheeting/waterproofing and scaffolding set for masonry work

Sheeting – Parapet Walls

Look closely on the right side of this picture…new ductwork is installed!

Current Tasks This Week

  • Frame exterior wall
  • Sheet exterior wall
  • Frame 1-5/8″ studs at perimeter walls
  • Remove brick from opening
  • Insulate HVAC duct in crawl space
  • HVAC duct installed 3rd floor
  • Waterproof exterior sheeting
  • Fire protection rough-in
  • Plumbing rough-in 2nd floor
  • Masonry scaffold set-up
  • Blocking and sheeting installed on parapet walls
  • Begin Exterior Masonry work

Upcoming Week Planned Tasks

  • Framing exterior walls and exterior sheeting
  • Frame interior walls
  • Build steps at end of stage
  • Roof Blocking
  • Plumbing rough-in
  • HVAC duct at Rectory
  • Sprinkler rough-in at Rectory
  • Roofing