If you look closely at the picture below you will notice the addition of the leftmost opening in the current exterior brick wall. This new opening will not only serve as the transition from the new lobby/gallery area into the Sojourn Kids check-in area, but it will also serve as one of the central transition points from the new addition into the existing cathedral area.
As fall is fast approaching we are excited about all the transitions taking place! This week we were excited to see the first floor slab installed. Once this work is complete it will only be a matter of time before the steel is erected and the new addition to St.Vincent really starts to take shape.
Exterior Opening to Kids area (below)
Slab Rough in and Prep in Progress (below)
Concrete Placement (below)

Tasks Completed Last Week:
- Continued interior tuck pointing
- Continued through wall penetrations
- Continued under slab rough ins
- Under slab inspection is complete
- Prep foundations for new slab
- Install floor
Tasks to be Completed This Week:
- Begin metal stud framing
- Structural steel delivery
- Tuck Pointing
- Misc. Carpentry
- Wall penetrations